risk-register-template@1.0.0
VERIFIED· install onlyPublisher claims: "Create and review a project risk register with scored risks, owners, mitigations, tripwires, and monthly updates." Observed in sandbox: no network, touches nothing outside the project, writes no memory.
Coverage
Nothing executable in the bundle ran; the trace covers the install step only.- Tested
- every file read, file written and host contacted by what ran
- Not tested
- use of the skill by an agent
Behavior
In our sandbox run on 2026-11-24, [email protected] read no files and called no hosts, and its code names no environment variables. Coverage: install only.
Files read
None recorded.
Hosts called
None recorded.
Environment variables its code names
None found.
Names only, read from the code. We never hold a value.
Tools offered
No tool list recorded.
Changes since the prior version
No prior version with a result to compare.
What we did not test
- use of the skill by an agent
| Run date | 2026-11-24 |
| Coverage | install only |
| Engine | 1.9.2, script@linux |
| Reproduce | npx -y vet-skills try risk-register-template |
| This record | behavior.json, behavior.md, signed attestation |
This is a record of what one version did in the runs we made. It is evidence, not a certificate.
Is [email protected] safe to install?
KillerSkills ran it in the KillerSkills honeypot sandbox (1 scenario; nothing executable in the bundle ran; the trace covers the install step only) on 2026-11-24 and scored it 93/100 (Verified). In what ran, nothing we could detect went wrong: no undeclared network egress, no credential reads, no persistent instruction writes. What it does with a real credential was not observed; the static findings and the publisher carry the rest of the score. Summary: no network, touches nothing outside the project, writes no memory.
Behavior trace
Honeypot run · 0 s · 1 scenarios · 0 deviationsStatic findings
No findings across 39 lines in 1 files.
Cost to the agent
Tokens estimated at four characters each. Skills load their instruction text when triggered; the figure is what that costs.
Known vulnerabilities
Vulnerability advisories (OSV) cover npm and PyPI packages; this registry has no advisory database.