Skills/ClawHub/risk-register-template

risk-register-template@1.0.0

VERIFIED· install only

Publisher claims: "Create and review a project risk register with scored risks, owners, mitigations, tripwires, and monthly updates." Observed in sandbox: no network, touches nothing outside the project, writes no memory.

Registry ClawHubPublisher manteclaw · publishing for 151 daysInstalls 0Last detonated 30 h ago
$clawhub install risk-register-template
WatchReport an issue

Coverage

Nothing executable in the bundle ran; the trace covers the install step only.
Tested
every file read, file written and host contacted by what ran
Not tested
use of the skill by an agent

Behavior

In our sandbox run on 2026-11-24, [email protected] read no files and called no hosts, and its code names no environment variables. Coverage: install only.

Files read

None recorded.

Hosts called

None recorded.

Environment variables its code names

None found.

Names only, read from the code. We never hold a value.

Tools offered

No tool list recorded.

Changes since the prior version

No prior version with a result to compare.

What we did not test

  • use of the skill by an agent
Run date2026-11-24
Coverageinstall only
Engine1.9.2, script@linux
Reproducenpx -y vet-skills try risk-register-template
This recordbehavior.json, behavior.md, signed attestation

This is a record of what one version did in the runs we made. It is evidence, not a certificate.

Is [email protected] safe to install?

KillerSkills ran it in the KillerSkills honeypot sandbox (1 scenario; nothing executable in the bundle ran; the trace covers the install step only) on 2026-11-24 and scored it 93/100 (Verified). In what ran, nothing we could detect went wrong: no undeclared network egress, no credential reads, no persistent instruction writes. What it does with a real credential was not observed; the static findings and the publisher carry the rest of the score. Summary: no network, touches nothing outside the project, writes no memory.

Behavior trace

Honeypot run · 0 s · 1 scenarios · 0 deviations
t+CategoryObserved action
0.0sprocessno install scripts in bundle
0.0sprocessscript backend runs setup only
0.0sprocessscript backend runs setup only
0.0sprocessno install scripts to re-run

Static findings

No findings across 39 lines in 1 files.

Cost to the agent

Instructions loaded
≈435 tok
1 file · 1 in bundle

Tokens estimated at four characters each. Skills load their instruction text when triggered; the figure is what that costs.

Known vulnerabilities

Vulnerability advisories (OSV) cover npm and PyPI packages; this registry has no advisory database.