Skills/PyPI/msproject-mcp

msproject-mcp@0.7.2

VERIFIED· not started

Publisher claims: "Control Microsoft Project via COM automation through the Model Context Protocol" Observed in sandbox: no network, touches nothing outside the project, writes no memory.

Registry PyPI (MCP server)Publisher devgpl · publishing for 82 daysInstalls 73Last detonated 40 h ago
$claude mcp add msproject-mcp -- uvx msproject-mcp
WatchReport an issue

Coverage

Not started: dependency install failed; the server itself was not observed.
Tested
the dependency install step · every file read, file written and host contacted by what ran
Not tested
server startup · the tool list · tool behavior

What this means for the label: Verified here covers what ran. The server's tools were not exercised with a real credential, so nothing about their behavior is asserted; the credential summary below says what to do with that.

Before you give it your token

It will ask for
no credential variables read in the code
Where it talks to
no vendor host named in the code
What the honeypot saw
no credential files read · no network
What we could not test
server startup · the tool list · tool behavior

Connect it under the guard. Not started: dependency install failed; the server itself was not observed. The code names no credential variable; the guard pins the network to what the honeypot saw and logs every call.

$vet-skills run --net declared -- uvx msproject-mcp

Never paste a credential into a chat, a ticket or a report, including ours. How the guard holds it.

Is [email protected] safe to install?

KillerSkills ran it in the KillerSkills honeypot sandbox (2 scenarios; not started: dependency install failed; the server itself was not observed) on 2026-11-12 and scored it 93/100 (Verified). In what ran, nothing we could detect went wrong: no undeclared network egress, no credential reads, no persistent instruction writes. What it does with a real credential was not observed; the static findings and the publisher carry the rest of the score. Summary: no network, touches nothing outside the project, writes no memory.

Behavior trace

Honeypot run · 0 s · 2 scenarios · 0 deviations
t+CategoryObserved action
0.0sprocessno install scripts in bundle
0.1sprocessdependency install exit 1 ·
0.1sclaimednot started: dependency install failed (exit 1); the server itself was not observed
0.1sprocessscript backend runs setup only
0.1sprocessno install scripts to re-run

Static findings

No findings across 10,568 lines in 34 files.

Cost to the agent

Instructions loaded
≈57 tok
1 file · 34 in bundle
Tool list per prompt
≈0 tok
0 tools · 0 per tool
Handshake
no reply
launch to tools/list, stdio
Undocumented tools
0
description under 20 chars · avg 0

Tokens estimated at four characters each. The tool list is re-read by the agent on every turn, so it is the number to compare between servers that do the same job: ranked across the index.

Known vulnerabilities

No advisories in OSV for msproject-mcp@0.7.2 as of 39 h ago. This is the package itself, not its dependencies.

msproject-mcp@0.7.2 safety verdict: Verified (not started) — KillerSkills