Skills/ClawHub/cx-commissioning-plan-drafter

cx-commissioning-plan-drafter@0.1.0

VERIFIED· install only

Publisher claims: "Use this skill when a commissioning authority (CxA), building commissioning professional, MEP engineer, or owner's representative needs to draft a project co..." Observed in sandbox: no network, touches nothing outside the project, writes no memory.

Registry ClawHubPublisher archlab-space · publishing for 168 daysInstalls 654Last detonated 4 h ago
$clawhub install cx-commissioning-plan-drafter
WatchReport an issue

Coverage

Nothing executable in the bundle ran; the trace covers the install step only.
Tested
every file read, file written and host contacted by what ran
Not tested
use of the skill by an agent

Is [email protected] safe to install?

KillerSkills ran it in the KillerSkills honeypot sandbox (1 scenario; nothing executable in the bundle ran; the trace covers the install step only) on 2026-11-14 and scored it 93/100 (Verified). In what ran, nothing we could detect went wrong: no undeclared network egress, no credential reads, no persistent instruction writes. What it does with a real credential was not observed; the static findings and the publisher carry the rest of the score. Summary: no network, touches nothing outside the project, writes no memory.

Behavior trace

Honeypot run · 0 s · 1 scenarios · 0 deviations
t+CategoryObserved action
0.0sprocessno install scripts in bundle
0.0sprocessscript backend runs setup only
0.0sprocessscript backend runs setup only
0.0sprocessno install scripts to re-run

Static findings

No findings across 372 lines in 4 files.

Cost to the agent

Instructions loaded
≈3,652 tok
1 file · 4 in bundle

Tokens estimated at four characters each. Skills load their instruction text when triggered; the figure is what that costs.

Known vulnerabilities

Vulnerability advisories (OSV) cover npm and PyPI packages; this registry has no advisory database.

cx-commissioning-plan-drafter@0.1.0 safety verdict: Verified (install only) — KillerSkills